Sundsvall Bridge
Material: total weight of approximately 23,000 tons
Pipe dimensions: Ø 610 × 25
Special features: By using prefabricated sections, 1.4 kilometers were installed within a single summer.
The steel structure, weighing a total of 23,000 tons, was awarded the German Steel Construction Engineering Prize in 2015. The 1.4-kilometer-long bridge was completed in just one summer thanks to prefabricated components. The steel pipes required for the project were supplied by ProPipe.